As a result of the sports hall at Myrescough, we are currently assessing the feasibility of building a new sports hall at Arnold School. This will also provide Drama Rooms as well as new changing rooms and locker rooms.
The school required alterations to the offices and entrance foyer to form a focal point by creating a new reception area. We introduced a circular focus as a complete contrast to the rather bland, rigid square geometry of the 1950’s school foyer.
The practice as part of a Design & Build project, was involved with the design of a new Sports Hall which has been recently completed within the College campus. The practice has also produced a master plan of the main site for the college, and has carried out designs for a new student accommodation block.
As part of a Design & Build project, we were able to provide the school with a new independant two storey unit, which houses a gym on the ground floor and classrooms above, set within the matured landscaped grounds of an established private primary school. The practice was approached again to design a similar sized unit which was built as an extension to the side of the previous unit to create additional classrooms.
The practice produced interior, constructional details and presentation drawings for a new refectory extension and refurbishment of a tertiary college.